暂无数据
2022-03-21
[Shipment News] Allis Saga Supports 250t/h Basalt Project in Russia
Following the successful delivery and operation of the 210t/h diabase EPC aggregate production line completed in Krasnoyarsk Krai, Russia in 2020, Allis Saga won the bid for a 250t/h basalt project of a Russian enterprise in September last year, thanks to its high-performance equipment, sophisticated technology, and strong reputation in the overseas market.
2022-01-24
Recently, an MH300 single-cylinder hydraulic cone crusher supplied by Allis Saga has commenced operation at the granite project site of Lafarge Mining South Africa (Pty) Limited. This equipment replaces the previously installed short-head cone crusher from a well-known international brand.
2021-04-17
[Shipment News] 1,700t/h Limestone Mine Comprehensive Development and Utilization Project in Zhuji
Recently, the main equipment has been successively delivered to the site of a 1,700t/h limestone mine comprehensive development and utilization project in Zhuji, for which Allis Saga is supplying a complete set of crushing and screening equipment.
2021-01-18
[Equipment Delivery News] Ningbo Jintongshan Mine Comprehensive Development and Utilization Project
Yesterday morning, 8 units of MJ1511 jaw crushers and 8 units of FD1560 grizzly feeders arrived at the site, marking that all 96 sets of main equipment supplied by Allis Saga for the Ningbo Jintongshan Mine Comprehensive Development and Utilization Project have been delivered successfully.
2020-11-23
[Good News] Allis Saga Successfully Achieves CE Certification from TÜV SÜD
Thanks to its advanced concepts, sophisticated manufacturing capabilities, international management and production standards, and first-class hardware and software facilities, the company has successfully obtained the CE certification issued by TÜV SÜD.
2020-08-21
[Chengde Project News] Allis Saga Equipment at Jingcheng Group
Since the establishment of Allis Saga’s Beijing Sales and Technical Service Center in 2014, it has provided comprehensive services for the crushing and screening equipment of Baoshan Mining and Jingcheng Fine Ore Center under Jingcheng Group, including the provision and supply of main equipment, after-sales service, technical training, technological transformation, and spare parts for all imported equipment.
2020-08-07
In 2019, the customer planned to build a 1 million t/a iron ore production line. Based on comprehensive comparisons of design proposals, technological processes, and equipment from multiple well-known domestic and foreign brands, and inspections and analyses of several reputable equipment manufacturers in the market, the customer ultimately selected Allis Saga as its partner to supply all equipment for feeding, crushing and screening operations.
2020-07-24
[Commissioning News] Allis Saga 210 t/h Diabase EPC Project in Russia
Recently, Allis Saga’s 210 t/h diabase EPC project in Russia was officially commissioned, and a commissioning ceremony was held.
2019-11-06
[Shipment News] Allis Saga 210 t/h Diabase EPC Project in Russia
This April, after multiple rounds of inspection and evaluation, Allis Saga secured the EPC project order for a 210 t/h diabase production line from a Russian state-owned enterprise, relying on its advanced equipment and technology.
2019-08-01
Technological Transformation Project of 1000 Ton/Hour Limestone Production Line in Nanyang, Henan
After purchasing one Allis Saga MH600 cone crusher in 2016, the customer of the 1000 t/h production line technological transformation project in Nanyang, Henan, purchased two additional units of the same model in June 2019 to replace the original impact crushers, aiming to achieve economical operation of the production line while increasing the original capacity.